A technical visit to two hydroelectric power plants, HPP Zakučac (536 MW) and HPP Kraljevac (42 MW) have been planned for May 27, 2021. The participants will be provided with the lunch box and bus transportation. Buses will leave from the meeting location at noon and will return to the same location at 4 p.m. An estimate of a driving distance is:

Departure Arrival Distance
Meeting location HPP Zakučac 25 km
HPP Zakučac HPP Kraljevac 30 km